logo
Products
PRODUCTS DETAILS
Home > Products >
Large Diameter UHMWPE Mining Tailing Pipe Impact Resistant UV Stabilized DN800

Large Diameter UHMWPE Mining Tailing Pipe Impact Resistant UV Stabilized DN800

MOQ: 60 Meters
Price: USD 30-95 / Meter
Standard Packaging: Bundled with steel strapping, end caps and UV resistant wrapping film
Delivery Period: 10-20 working days after deposit
Payment Method: T/T, L/C at sight, Western Union
Supply Capacity: 1500 Meters per Month
Detail Information
Place of Origin
Shandong, China
Brand Name
Jiubei
Certification
ISO 9001:2015, SGS, CCS
Model Number
DN800
Material:
Virgin UHMWPE, Molecular Weight 3.5-6 Million, UV Stabilised
Nominal Diameter:
DN800 (32 Inch), DN600-DN1200 Available
Wall Thickness:
20-50 Mm
Impact Strength:
About 5 Times HDPE, 2 Times PC Pipe
Working Pressure:
0.25-1.6 MPa
UV Resistance:
Stabilised For Continuous Outdoor Exposure
Unit Length:
6-12 M
Connection:
Flange, Socket Fusion, Butt Fusion
Colour:
Black, Yellow, Grey Or Custom RAL
Application:
Mine Tailing, Ore Slurry, Coarse Sand Discharge
Highlight:

Large Diameter UHMWPE Tailing Pipe

,

Impact Resistant UHMWPE Pipe

,

UV Stabilized UHMWPE DN800 Pipe

Product Description
Product Overview

Large diameter is where plastic pipe usually fails first: a DN800 line with a thin wall cannot take the water hammer of a pump start, and it cannot take a rock dropped in during installation. This pipe is built the other way round, with a 20 to 50 mm wall and impact strength around five times HDPE.

It is stabilised against UV, so it can be stored in an open yard or laid above ground on a tailing route for years without chalking or embrittlement.

Key Specifications
MaterialVirgin UHMWPE, molecular weight 3.5-6 million, UV stabilised compound
Nominal diameterDN800 standard; DN600 and DN1000-DN1200 available
Wall thickness20-50 mm
Impact strengthAbout 5 times HDPE pipe, 2 times PC pipe
Working pressure0.25-1.6 MPa
Unit length6-12 m per piece
ConnectionFlange, socket fusion or butt fusion
UV resistanceStabilised for continuous outdoor exposure, above ground laying accepted
ColourBlack, yellow, grey or custom RAL
ApplicationMine tailing, ore slurry, coarse sand and gravel discharge
Engineering Advantages at Large Diameter
  • Impact resistance of about five times HDPE lets the pipe absorb water hammer at pump start and rough handling during installation.
  • Coarse particles slide over the bore instead of embedding in it, because the surface is self lubricating and non wetting.
  • UV stabilised wall allows above ground laying and open yard storage on tropical sites without covers.
  • Wall thickness up to 50 mm gives a long wear allowance, so the line can be rotated in the saddles to extend service life.
  • Weight stays around one eighth of an equivalent steel pipe, which matters when a DN800 line has to be moved by excavator or barge crane.
Applications in Indonesia, Vietnam and Myanmar

Indonesia: nickel laterite and coal mining operations in Kalimantan and Sumatra lay DN800 tailing lines over long outdoor routes; UV stabilisation and impact strength are the two properties site engineers ask about first.

Vietnam: quarry and stone crushing plants discharge coarse sand and gravel, where wall thickness rather than pressure rating sets the replacement interval.

Myanmar: remote mine sites with unpaved access roads prefer large diameter pipes that can be handled by simple equipment and jointed without welding machines.

Laying and Jointing Large Diameter Pipe
  • Use nylon slings rather than chains when lifting; the pipe is light but the surface should not be scored.
  • Support spacing on saddles should not exceed 1.5 m for DN800; add rollers where the line crosses thermal movement.
  • Socket fusion or butt fusion is used for buried sections, flanges for pump connections and valved spools.
  • Rotate the pipe a quarter turn at mid life where one side of the bore wears faster on horizontal slurry runs.
Manufacturing, Testing and Compliance

Shandong Jiubei has produced and exported UHMWPE and HDPE dredging pipelines since 2008, with more than 90 percent of output going to overseas dredging, mining and power projects. Every production batch is extruded from virgin UHMWPE resin with a declared molecular weight, and the resin certificate is filed against the order number so the material history of your pipes can be traced back to the raw material lot.

Finished pipes are checked for wall thickness, ovality, flange squareness and weld soundness. We issue a mill test certificate with each shipment, hold ISO 9001:2015, SGS and CCS certification, and welcome third party inspection by SGS, BV or Intertek before loading. Pressure and drop tests can be witnessed at our yard in Shandong.

Packaging, Delivery and After Sales

Pipes are packed in sea worthy bundles with end caps, steel strapping and moisture barrier film; flange spools and fittings travel in fumigated wooden cases. Standard sizes leave the yard in 7 to 15 working days, and we ship FOB Qingdao or CFR to Jakarta, Surabaya, Ho Chi Minh City, Hai Phong and Yangon. A 12 month warranty covers material and workmanship defects, and spare fittings are kept in stock for repeat projects.

Frequently Asked QuestionsHow do I choose the right diameter and wall thickness?

Send the flow rate, solids content and pump pressure. Our engineers calculate the minimum internal diameter that keeps the slurry velocity above the settling point, then select wall thickness from the working pressure with a safety factor of at least 2. A sized drawing is returned with the quotation.

Can you supply flanges that match our existing line?

Yes. We machine steel flanges to DIN, ANSI, JIS, BS or SABS drilling patterns, and can copy a sample flange or send a matching drilling template before production starts.

What is the lead time for a repeat order?

Standard diameters and wall thicknesses ship in 7 to 15 working days. Non standard colours, sandblast surface or custom flange drilling add 5 to 10 working days depending on quantity.

Talk to Our Pipeline Engineers

Send your pipeline diameter, media type, flow rate and discharge distance through the inquiry form on this page. Our engineering team replies within one working day with a sized proposal, flange drawing and a quotation valid for 30 days. Samples and third party inspection are available on request before you place a bulk order.

Products
PRODUCTS DETAILS
Large Diameter UHMWPE Mining Tailing Pipe Impact Resistant UV Stabilized DN800
MOQ: 60 Meters
Price: USD 30-95 / Meter
Standard Packaging: Bundled with steel strapping, end caps and UV resistant wrapping film
Delivery Period: 10-20 working days after deposit
Payment Method: T/T, L/C at sight, Western Union
Supply Capacity: 1500 Meters per Month
Detail Information
Place of Origin
Shandong, China
Brand Name
Jiubei
Certification
ISO 9001:2015, SGS, CCS
Model Number
DN800
Material:
Virgin UHMWPE, Molecular Weight 3.5-6 Million, UV Stabilised
Nominal Diameter:
DN800 (32 Inch), DN600-DN1200 Available
Wall Thickness:
20-50 Mm
Impact Strength:
About 5 Times HDPE, 2 Times PC Pipe
Working Pressure:
0.25-1.6 MPa
UV Resistance:
Stabilised For Continuous Outdoor Exposure
Unit Length:
6-12 M
Connection:
Flange, Socket Fusion, Butt Fusion
Colour:
Black, Yellow, Grey Or Custom RAL
Application:
Mine Tailing, Ore Slurry, Coarse Sand Discharge
Minimum Order Quantity:
60 Meters
Price:
USD 30-95 / Meter
Packaging Details:
Bundled with steel strapping, end caps and UV resistant wrapping film
Delivery Time:
10-20 working days after deposit
Payment Terms:
T/T, L/C at sight, Western Union
Supply Ability:
1500 Meters per Month
Highlight

Large Diameter UHMWPE Tailing Pipe

,

Impact Resistant UHMWPE Pipe

,

UV Stabilized UHMWPE DN800 Pipe

Product Description
Product Overview

Large diameter is where plastic pipe usually fails first: a DN800 line with a thin wall cannot take the water hammer of a pump start, and it cannot take a rock dropped in during installation. This pipe is built the other way round, with a 20 to 50 mm wall and impact strength around five times HDPE.

It is stabilised against UV, so it can be stored in an open yard or laid above ground on a tailing route for years without chalking or embrittlement.

Key Specifications
MaterialVirgin UHMWPE, molecular weight 3.5-6 million, UV stabilised compound
Nominal diameterDN800 standard; DN600 and DN1000-DN1200 available
Wall thickness20-50 mm
Impact strengthAbout 5 times HDPE pipe, 2 times PC pipe
Working pressure0.25-1.6 MPa
Unit length6-12 m per piece
ConnectionFlange, socket fusion or butt fusion
UV resistanceStabilised for continuous outdoor exposure, above ground laying accepted
ColourBlack, yellow, grey or custom RAL
ApplicationMine tailing, ore slurry, coarse sand and gravel discharge
Engineering Advantages at Large Diameter
  • Impact resistance of about five times HDPE lets the pipe absorb water hammer at pump start and rough handling during installation.
  • Coarse particles slide over the bore instead of embedding in it, because the surface is self lubricating and non wetting.
  • UV stabilised wall allows above ground laying and open yard storage on tropical sites without covers.
  • Wall thickness up to 50 mm gives a long wear allowance, so the line can be rotated in the saddles to extend service life.
  • Weight stays around one eighth of an equivalent steel pipe, which matters when a DN800 line has to be moved by excavator or barge crane.
Applications in Indonesia, Vietnam and Myanmar

Indonesia: nickel laterite and coal mining operations in Kalimantan and Sumatra lay DN800 tailing lines over long outdoor routes; UV stabilisation and impact strength are the two properties site engineers ask about first.

Vietnam: quarry and stone crushing plants discharge coarse sand and gravel, where wall thickness rather than pressure rating sets the replacement interval.

Myanmar: remote mine sites with unpaved access roads prefer large diameter pipes that can be handled by simple equipment and jointed without welding machines.

Laying and Jointing Large Diameter Pipe
  • Use nylon slings rather than chains when lifting; the pipe is light but the surface should not be scored.
  • Support spacing on saddles should not exceed 1.5 m for DN800; add rollers where the line crosses thermal movement.
  • Socket fusion or butt fusion is used for buried sections, flanges for pump connections and valved spools.
  • Rotate the pipe a quarter turn at mid life where one side of the bore wears faster on horizontal slurry runs.
Manufacturing, Testing and Compliance

Shandong Jiubei has produced and exported UHMWPE and HDPE dredging pipelines since 2008, with more than 90 percent of output going to overseas dredging, mining and power projects. Every production batch is extruded from virgin UHMWPE resin with a declared molecular weight, and the resin certificate is filed against the order number so the material history of your pipes can be traced back to the raw material lot.

Finished pipes are checked for wall thickness, ovality, flange squareness and weld soundness. We issue a mill test certificate with each shipment, hold ISO 9001:2015, SGS and CCS certification, and welcome third party inspection by SGS, BV or Intertek before loading. Pressure and drop tests can be witnessed at our yard in Shandong.

Packaging, Delivery and After Sales

Pipes are packed in sea worthy bundles with end caps, steel strapping and moisture barrier film; flange spools and fittings travel in fumigated wooden cases. Standard sizes leave the yard in 7 to 15 working days, and we ship FOB Qingdao or CFR to Jakarta, Surabaya, Ho Chi Minh City, Hai Phong and Yangon. A 12 month warranty covers material and workmanship defects, and spare fittings are kept in stock for repeat projects.

Frequently Asked QuestionsHow do I choose the right diameter and wall thickness?

Send the flow rate, solids content and pump pressure. Our engineers calculate the minimum internal diameter that keeps the slurry velocity above the settling point, then select wall thickness from the working pressure with a safety factor of at least 2. A sized drawing is returned with the quotation.

Can you supply flanges that match our existing line?

Yes. We machine steel flanges to DIN, ANSI, JIS, BS or SABS drilling patterns, and can copy a sample flange or send a matching drilling template before production starts.

What is the lead time for a repeat order?

Standard diameters and wall thicknesses ship in 7 to 15 working days. Non standard colours, sandblast surface or custom flange drilling add 5 to 10 working days depending on quantity.

Talk to Our Pipeline Engineers

Send your pipeline diameter, media type, flow rate and discharge distance through the inquiry form on this page. Our engineering team replies within one working day with a sized proposal, flange drawing and a quotation valid for 30 days. Samples and third party inspection are available on request before you place a bulk order.