| MOQ: | 20 Meters |
| Price: | USD 45-180 / Meter |
| Standard Packaging: | Flange faces protected by wooden discs, spools fixed in fumigated wooden cases or bundled with steel straps |
| Delivery Period: | 15-25 working days after deposit |
| Payment Method: | T/T, L/C at sight |
| Supply Capacity: | 1200 Meters per Month |
Where a line has to carry abrasive slurry at high head, a plain plastic pipe is not enough. This composite pipe puts a thick UHMWPE liner inside a carbon steel shell, so the steel carries the pressure and the liner carries the wear.
The liner is expanded into the shell through a proprietary interference process, which closes the gap between liner and steel. That construction is what allows 5 to 8 MPa service in mine tailing, coal ash and high head slurry duty without the liner collapsing under vacuum.
Key Specifications| Structure | Carbon steel outer pipe + UHMWPE liner, interference bonded |
| Nominal diameter | DN200 to DN1200 |
| Liner thickness | 3-50 mm, selected against solids size and wear rate |
| Working pressure | 5-8 MPa, hydrostatic tested at 1.5 times rated pressure |
| Steel grade | Q235B, Q345B or 20# seamless, with material certificate |
| Connection | Fixed flange, loose flange or welded spool piece |
| Unit length | 6-12 m, or cut to route drawing |
| Temperature range | -20 C to 80 C |
| External coating | Anti corrosion primer plus top coat, colour to customer spec |
| Service life | Liner wear life 4-7 times Q235 steel under equal conditions |
Indonesia: copper and gold tailing lines in Sumbawa and North Sulawesi run at high head over long distances; the 5-8 MPa rating of this composite pipe suits the pump stations used there.
Vietnam: coal fired power plants and coal washing plants use lined steel pipe for ash and coal water slurry, where flange spools can be replaced section by section during scheduled outages.
Myanmar: mine tailing discharge lines that cross roads and embankments need the mechanical strength of a steel shell, combined with a bore that will not wear through in one wet season.
Fabrication and Installation SupportShandong Jiubei has produced and exported UHMWPE and HDPE dredging pipelines since 2008, with more than 90 percent of output going to overseas dredging, mining and power projects. Every production batch is extruded from virgin UHMWPE resin with a declared molecular weight, and the resin certificate is filed against the order number so the material history of your pipes can be traced back to the raw material lot.
Finished pipes are checked for wall thickness, ovality, flange squareness and weld soundness. We issue a mill test certificate with each shipment, hold ISO 9001:2015, SGS and CCS certification, and welcome third party inspection by SGS, BV or Intertek before loading. Pressure and drop tests can be witnessed at our yard in Shandong.
Composite spools are hydrostatically tested at 1.5 times the rated pressure and the liner to shell bond is checked by tapping and by end face inspection before painting. Steel mill certificates, liner resin reports and test records are compiled into one documentation package per shipment.
Packaging, Delivery and After SalesPipes are packed in sea worthy bundles with end caps, steel strapping and moisture barrier film; flange spools and fittings travel in fumigated wooden cases. Standard sizes leave the yard in 7 to 15 working days, and we ship FOB Qingdao or CFR to Jakarta, Surabaya, Ho Chi Minh City, Hai Phong and Yangon. A 12 month warranty covers material and workmanship defects, and spare fittings are kept in stock for repeat projects.
Frequently Asked QuestionsHow do I choose the right diameter and wall thickness?Send the flow rate, solids content and pump pressure. Our engineers calculate the minimum internal diameter that keeps the slurry velocity above the settling point, then select wall thickness from the working pressure with a safety factor of at least 2. A sized drawing is returned with the quotation.
Can you supply flanges that match our existing line?Yes. We machine steel flanges to DIN, ANSI, JIS, BS or SABS drilling patterns, and can copy a sample flange or send a matching drilling template before production starts.
What is the lead time for a repeat order?Standard diameters and wall thicknesses ship in 7 to 15 working days. Non standard colours, sandblast surface or custom flange drilling add 5 to 10 working days depending on quantity.
Can the liner be repaired on site if it is damaged?Yes. Local damage is cut back to sound material, the area is cleaned and a UHMWPE patch is welded in with a hand extruder. We supply patch rod and a short procedure with each order.
Talk to Our Pipeline EngineersSend your pipeline diameter, media type, flow rate and discharge distance through the inquiry form on this page. Our engineering team replies within one working day with a sized proposal, flange drawing and a quotation valid for 30 days. Samples and third party inspection are available on request before you place a bulk order.
| MOQ: | 20 Meters |
| Price: | USD 45-180 / Meter |
| Standard Packaging: | Flange faces protected by wooden discs, spools fixed in fumigated wooden cases or bundled with steel straps |
| Delivery Period: | 15-25 working days after deposit |
| Payment Method: | T/T, L/C at sight |
| Supply Capacity: | 1200 Meters per Month |
Where a line has to carry abrasive slurry at high head, a plain plastic pipe is not enough. This composite pipe puts a thick UHMWPE liner inside a carbon steel shell, so the steel carries the pressure and the liner carries the wear.
The liner is expanded into the shell through a proprietary interference process, which closes the gap between liner and steel. That construction is what allows 5 to 8 MPa service in mine tailing, coal ash and high head slurry duty without the liner collapsing under vacuum.
Key Specifications| Structure | Carbon steel outer pipe + UHMWPE liner, interference bonded |
| Nominal diameter | DN200 to DN1200 |
| Liner thickness | 3-50 mm, selected against solids size and wear rate |
| Working pressure | 5-8 MPa, hydrostatic tested at 1.5 times rated pressure |
| Steel grade | Q235B, Q345B or 20# seamless, with material certificate |
| Connection | Fixed flange, loose flange or welded spool piece |
| Unit length | 6-12 m, or cut to route drawing |
| Temperature range | -20 C to 80 C |
| External coating | Anti corrosion primer plus top coat, colour to customer spec |
| Service life | Liner wear life 4-7 times Q235 steel under equal conditions |
Indonesia: copper and gold tailing lines in Sumbawa and North Sulawesi run at high head over long distances; the 5-8 MPa rating of this composite pipe suits the pump stations used there.
Vietnam: coal fired power plants and coal washing plants use lined steel pipe for ash and coal water slurry, where flange spools can be replaced section by section during scheduled outages.
Myanmar: mine tailing discharge lines that cross roads and embankments need the mechanical strength of a steel shell, combined with a bore that will not wear through in one wet season.
Fabrication and Installation SupportShandong Jiubei has produced and exported UHMWPE and HDPE dredging pipelines since 2008, with more than 90 percent of output going to overseas dredging, mining and power projects. Every production batch is extruded from virgin UHMWPE resin with a declared molecular weight, and the resin certificate is filed against the order number so the material history of your pipes can be traced back to the raw material lot.
Finished pipes are checked for wall thickness, ovality, flange squareness and weld soundness. We issue a mill test certificate with each shipment, hold ISO 9001:2015, SGS and CCS certification, and welcome third party inspection by SGS, BV or Intertek before loading. Pressure and drop tests can be witnessed at our yard in Shandong.
Composite spools are hydrostatically tested at 1.5 times the rated pressure and the liner to shell bond is checked by tapping and by end face inspection before painting. Steel mill certificates, liner resin reports and test records are compiled into one documentation package per shipment.
Packaging, Delivery and After SalesPipes are packed in sea worthy bundles with end caps, steel strapping and moisture barrier film; flange spools and fittings travel in fumigated wooden cases. Standard sizes leave the yard in 7 to 15 working days, and we ship FOB Qingdao or CFR to Jakarta, Surabaya, Ho Chi Minh City, Hai Phong and Yangon. A 12 month warranty covers material and workmanship defects, and spare fittings are kept in stock for repeat projects.
Frequently Asked QuestionsHow do I choose the right diameter and wall thickness?Send the flow rate, solids content and pump pressure. Our engineers calculate the minimum internal diameter that keeps the slurry velocity above the settling point, then select wall thickness from the working pressure with a safety factor of at least 2. A sized drawing is returned with the quotation.
Can you supply flanges that match our existing line?Yes. We machine steel flanges to DIN, ANSI, JIS, BS or SABS drilling patterns, and can copy a sample flange or send a matching drilling template before production starts.
What is the lead time for a repeat order?Standard diameters and wall thicknesses ship in 7 to 15 working days. Non standard colours, sandblast surface or custom flange drilling add 5 to 10 working days depending on quantity.
Can the liner be repaired on site if it is damaged?Yes. Local damage is cut back to sound material, the area is cleaned and a UHMWPE patch is welded in with a hand extruder. We supply patch rod and a short procedure with each order.
Talk to Our Pipeline EngineersSend your pipeline diameter, media type, flow rate and discharge distance through the inquiry form on this page. Our engineering team replies within one working day with a sized proposal, flange drawing and a quotation valid for 30 days. Samples and third party inspection are available on request before you place a bulk order.