| MOQ: | 50 Meters |
| Price: | USD 10-28 / Meter |
| Standard Packaging: | Sea worthy bundle with end caps, moisture barrier film and steel strapping |
| Delivery Period: | 7-15 working days after deposit |
| Payment Method: | T/T, L/C at sight, Western Union |
| Supply Capacity: | 2500 Meters per Month |
This DN300 UHMWPE slurry pipe is specified for media that stick: fine tailings, phosphate slurry, mud, ash and clay bearing water. The bore is not coated - the whole wall is the same self lubricating material, so the non stick property cannot wear or chip away.
Because the surface neither scales nor grabs, the pipe holds its full internal diameter through the service life of the line. Operators see this as two savings: fewer pigging and cleaning stops, and less pump head needed to push the same volume.
Key Specifications| Material | Virgin UHMWPE, molecular weight 3.5-6 million |
| Nominal diameter | DN300 (12 inch) standard, DN200-DN1200 on request |
| Wall thickness | 10-40 mm |
| Friction coefficient | 0.009 against steel (steel to steel is about 0.013) |
| Bore surface | Smooth, non stick, self lubricating, non wetting |
| Working pressure | 0.25-2.0 MPa |
| Unit length | 2-12 m |
| Connection | Flange, socket fusion or mechanical coupler |
| Operating temperature | -60 C to 80 C |
| Scale behaviour | No calcification or agglomeration on the bore wall |
Indonesia: nickel and bauxite processing plants in Sulawesi and Kalimantan handle fine, clay rich tailings that scale steel lines within months; this anti scaling UHMWPE pipe keeps the flow area open and reduces cleaning downtime.
Vietnam: ceramics, cement and paper mills around Ho Chi Minh City and Hai Phong use DN300 lines for slurry and ash transport, where the lower pumping energy directly cuts electricity cost per tonne.
Myanmar: small scale mineral washing plants value the light weight and fusion jointing, which let a two man crew move and re assemble a line without a crane.
How the Line Is InstalledShandong Jiubei has produced and exported UHMWPE and HDPE dredging pipelines since 2008, with more than 90 percent of output going to overseas dredging, mining and power projects. Every production batch is extruded from virgin UHMWPE resin with a declared molecular weight, and the resin certificate is filed against the order number so the material history of your pipes can be traced back to the raw material lot.
Finished pipes are checked for wall thickness, ovality, flange squareness and weld soundness. We issue a mill test certificate with each shipment, hold ISO 9001:2015, SGS and CCS certification, and welcome third party inspection by SGS, BV or Intertek before loading. Pressure and drop tests can be witnessed at our yard in Shandong.
Packaging, Delivery and After SalesPipes are packed in sea worthy bundles with end caps, steel strapping and moisture barrier film; flange spools and fittings travel in fumigated wooden cases. Standard sizes leave the yard in 7 to 15 working days, and we ship FOB Qingdao or CFR to Jakarta, Surabaya, Ho Chi Minh City, Hai Phong and Yangon. A 12 month warranty covers material and workmanship defects, and spare fittings are kept in stock for repeat projects.
Frequently Asked QuestionsHow do I choose the right diameter and wall thickness?Send the flow rate, solids content and pump pressure. Our engineers calculate the minimum internal diameter that keeps the slurry velocity above the settling point, then select wall thickness from the working pressure with a safety factor of at least 2. A sized drawing is returned with the quotation.
Can you supply flanges that match our existing line?Yes. We machine steel flanges to DIN, ANSI, JIS, BS or SABS drilling patterns, and can copy a sample flange or send a matching drilling template before production starts.
What is the lead time for a repeat order?Standard diameters and wall thicknesses ship in 7 to 15 working days. Non standard colours, sandblast surface or custom flange drilling add 5 to 10 working days depending on quantity.
Talk to Our Pipeline EngineersSend your pipeline diameter, media type, flow rate and discharge distance through the inquiry form on this page. Our engineering team replies within one working day with a sized proposal, flange drawing and a quotation valid for 30 days. Samples and third party inspection are available on request before you place a bulk order.
| MOQ: | 50 Meters |
| Price: | USD 10-28 / Meter |
| Standard Packaging: | Sea worthy bundle with end caps, moisture barrier film and steel strapping |
| Delivery Period: | 7-15 working days after deposit |
| Payment Method: | T/T, L/C at sight, Western Union |
| Supply Capacity: | 2500 Meters per Month |
This DN300 UHMWPE slurry pipe is specified for media that stick: fine tailings, phosphate slurry, mud, ash and clay bearing water. The bore is not coated - the whole wall is the same self lubricating material, so the non stick property cannot wear or chip away.
Because the surface neither scales nor grabs, the pipe holds its full internal diameter through the service life of the line. Operators see this as two savings: fewer pigging and cleaning stops, and less pump head needed to push the same volume.
Key Specifications| Material | Virgin UHMWPE, molecular weight 3.5-6 million |
| Nominal diameter | DN300 (12 inch) standard, DN200-DN1200 on request |
| Wall thickness | 10-40 mm |
| Friction coefficient | 0.009 against steel (steel to steel is about 0.013) |
| Bore surface | Smooth, non stick, self lubricating, non wetting |
| Working pressure | 0.25-2.0 MPa |
| Unit length | 2-12 m |
| Connection | Flange, socket fusion or mechanical coupler |
| Operating temperature | -60 C to 80 C |
| Scale behaviour | No calcification or agglomeration on the bore wall |
Indonesia: nickel and bauxite processing plants in Sulawesi and Kalimantan handle fine, clay rich tailings that scale steel lines within months; this anti scaling UHMWPE pipe keeps the flow area open and reduces cleaning downtime.
Vietnam: ceramics, cement and paper mills around Ho Chi Minh City and Hai Phong use DN300 lines for slurry and ash transport, where the lower pumping energy directly cuts electricity cost per tonne.
Myanmar: small scale mineral washing plants value the light weight and fusion jointing, which let a two man crew move and re assemble a line without a crane.
How the Line Is InstalledShandong Jiubei has produced and exported UHMWPE and HDPE dredging pipelines since 2008, with more than 90 percent of output going to overseas dredging, mining and power projects. Every production batch is extruded from virgin UHMWPE resin with a declared molecular weight, and the resin certificate is filed against the order number so the material history of your pipes can be traced back to the raw material lot.
Finished pipes are checked for wall thickness, ovality, flange squareness and weld soundness. We issue a mill test certificate with each shipment, hold ISO 9001:2015, SGS and CCS certification, and welcome third party inspection by SGS, BV or Intertek before loading. Pressure and drop tests can be witnessed at our yard in Shandong.
Packaging, Delivery and After SalesPipes are packed in sea worthy bundles with end caps, steel strapping and moisture barrier film; flange spools and fittings travel in fumigated wooden cases. Standard sizes leave the yard in 7 to 15 working days, and we ship FOB Qingdao or CFR to Jakarta, Surabaya, Ho Chi Minh City, Hai Phong and Yangon. A 12 month warranty covers material and workmanship defects, and spare fittings are kept in stock for repeat projects.
Frequently Asked QuestionsHow do I choose the right diameter and wall thickness?Send the flow rate, solids content and pump pressure. Our engineers calculate the minimum internal diameter that keeps the slurry velocity above the settling point, then select wall thickness from the working pressure with a safety factor of at least 2. A sized drawing is returned with the quotation.
Can you supply flanges that match our existing line?Yes. We machine steel flanges to DIN, ANSI, JIS, BS or SABS drilling patterns, and can copy a sample flange or send a matching drilling template before production starts.
What is the lead time for a repeat order?Standard diameters and wall thicknesses ship in 7 to 15 working days. Non standard colours, sandblast surface or custom flange drilling add 5 to 10 working days depending on quantity.
Talk to Our Pipeline EngineersSend your pipeline diameter, media type, flow rate and discharge distance through the inquiry form on this page. Our engineering team replies within one working day with a sized proposal, flange drawing and a quotation valid for 30 days. Samples and third party inspection are available on request before you place a bulk order.