| MOQ: | 100 Meters |
| Price: | USD 8-25 / Meter |
| Standard Packaging: | Sea worthy bundle with end caps, steel strapping and moisture barrier film |
| Delivery Period: | 7-15 working days after deposit |
| Payment Method: | T/T, L/C at sight, Western Union |
| Supply Capacity: | 3000 Meters per Month |
This wear resistant UHMWPE dredging pipe is the workhorse line of our range: a single layer, stress relieved polyethylene pipe with a wall thickness built for abrasive sand and slurry service, supplied from DN200 up to DN1200 with fixed steel flanges at both ends.
The pipe is aimed at dredging contractors and sand yards in Southeast Asia that are replacing mild steel or HDPE lines every one or two seasons. Its very high molecular weight resin gives a low friction surface and high abrasion resistance, so the pipe keeps its bore instead of wearing into an oval.
Key Specifications| Material | Virgin UHMWPE, molecular weight 3.5-6 million, UV stabilised masterbatch |
| Diameter range | DN200, DN250, DN300, DN400, DN500, DN600, DN800, DN1000, DN1200 (8 inch to 48 inch) |
| Wall thickness | 8 mm to 50 mm, selected against working pressure |
| Working pressure | 0.25-2.5 MPa, safety factor 2 minimum |
| Flange | Fixed steel flange, drilled to DIN, ANSI, JIS, BS or SABS pattern |
| Unit length | 2-12 m per piece, cut to drawing |
| Colour | Black, yellow, green, blue or custom RAL |
| Service temperature | -60 C to 80 C |
| Design life | Abrasion life 4-7 times Q235 steel pipe under the same conditions |
Indonesia: sand and tin dredging operations in Bangka Belitung and marine reclamation around Jakarta Bay run abrasive silica slurry that destroys steel pipe quickly; the flanged DN300 to DN600 versions of this line are our standard recommendation for cutter suction dredger discharge.
Vietnam: river sand mining and channel maintenance in the Mekong delta use floating and shore lines with frequent repositioning, where the light weight of UHMWPE pipe reduces the number of support floats needed.
Myanmar: coastal reclamation and port dredging projects around Yangon prefer flanged joints that can be opened on site with hand tools, because welding equipment is often not available on the barge.
Installation and ConnectionShandong Jiubei has produced and exported UHMWPE and HDPE dredging pipelines since 2008, with more than 90 percent of output going to overseas dredging, mining and power projects. Every production batch is extruded from virgin UHMWPE resin with a declared molecular weight, and the resin certificate is filed against the order number so the material history of your pipes can be traced back to the raw material lot.
Finished pipes are checked for wall thickness, ovality, flange squareness and weld soundness. We issue a mill test certificate with each shipment, hold ISO 9001:2015, SGS and CCS certification, and welcome third party inspection by SGS, BV or Intertek before loading. Pressure and drop tests can be witnessed at our yard in Shandong.
Packaging, Delivery and After SalesPipes are packed in sea worthy bundles with end caps, steel strapping and moisture barrier film; flange spools and fittings travel in fumigated wooden cases. Standard sizes leave the yard in 7 to 15 working days, and we ship FOB Qingdao or CFR to Jakarta, Surabaya, Ho Chi Minh City, Hai Phong and Yangon. A 12 month warranty covers material and workmanship defects, and spare fittings are kept in stock for repeat projects.
Frequently Asked QuestionsHow do I choose the right diameter and wall thickness?Send the flow rate, solids content and pump pressure. Our engineers calculate the minimum internal diameter that keeps the slurry velocity above the settling point, then select wall thickness from the working pressure with a safety factor of at least 2. A sized drawing is returned with the quotation.
Can you supply flanges that match our existing line?Yes. We machine steel flanges to DIN, ANSI, JIS, BS or SABS drilling patterns, and can copy a sample flange or send a matching drilling template before production starts.
What is the lead time for a repeat order?Standard diameters and wall thicknesses ship in 7 to 15 working days. Non standard colours, sandblast surface or custom flange drilling add 5 to 10 working days depending on quantity.
Talk to Our Pipeline EngineersSend your pipeline diameter, media type, flow rate and discharge distance through the inquiry form on this page. Our engineering team replies within one working day with a sized proposal, flange drawing and a quotation valid for 30 days. Samples and third party inspection are available on request before you place a bulk order.
| MOQ: | 100 Meters |
| Price: | USD 8-25 / Meter |
| Standard Packaging: | Sea worthy bundle with end caps, steel strapping and moisture barrier film |
| Delivery Period: | 7-15 working days after deposit |
| Payment Method: | T/T, L/C at sight, Western Union |
| Supply Capacity: | 3000 Meters per Month |
This wear resistant UHMWPE dredging pipe is the workhorse line of our range: a single layer, stress relieved polyethylene pipe with a wall thickness built for abrasive sand and slurry service, supplied from DN200 up to DN1200 with fixed steel flanges at both ends.
The pipe is aimed at dredging contractors and sand yards in Southeast Asia that are replacing mild steel or HDPE lines every one or two seasons. Its very high molecular weight resin gives a low friction surface and high abrasion resistance, so the pipe keeps its bore instead of wearing into an oval.
Key Specifications| Material | Virgin UHMWPE, molecular weight 3.5-6 million, UV stabilised masterbatch |
| Diameter range | DN200, DN250, DN300, DN400, DN500, DN600, DN800, DN1000, DN1200 (8 inch to 48 inch) |
| Wall thickness | 8 mm to 50 mm, selected against working pressure |
| Working pressure | 0.25-2.5 MPa, safety factor 2 minimum |
| Flange | Fixed steel flange, drilled to DIN, ANSI, JIS, BS or SABS pattern |
| Unit length | 2-12 m per piece, cut to drawing |
| Colour | Black, yellow, green, blue or custom RAL |
| Service temperature | -60 C to 80 C |
| Design life | Abrasion life 4-7 times Q235 steel pipe under the same conditions |
Indonesia: sand and tin dredging operations in Bangka Belitung and marine reclamation around Jakarta Bay run abrasive silica slurry that destroys steel pipe quickly; the flanged DN300 to DN600 versions of this line are our standard recommendation for cutter suction dredger discharge.
Vietnam: river sand mining and channel maintenance in the Mekong delta use floating and shore lines with frequent repositioning, where the light weight of UHMWPE pipe reduces the number of support floats needed.
Myanmar: coastal reclamation and port dredging projects around Yangon prefer flanged joints that can be opened on site with hand tools, because welding equipment is often not available on the barge.
Installation and ConnectionShandong Jiubei has produced and exported UHMWPE and HDPE dredging pipelines since 2008, with more than 90 percent of output going to overseas dredging, mining and power projects. Every production batch is extruded from virgin UHMWPE resin with a declared molecular weight, and the resin certificate is filed against the order number so the material history of your pipes can be traced back to the raw material lot.
Finished pipes are checked for wall thickness, ovality, flange squareness and weld soundness. We issue a mill test certificate with each shipment, hold ISO 9001:2015, SGS and CCS certification, and welcome third party inspection by SGS, BV or Intertek before loading. Pressure and drop tests can be witnessed at our yard in Shandong.
Packaging, Delivery and After SalesPipes are packed in sea worthy bundles with end caps, steel strapping and moisture barrier film; flange spools and fittings travel in fumigated wooden cases. Standard sizes leave the yard in 7 to 15 working days, and we ship FOB Qingdao or CFR to Jakarta, Surabaya, Ho Chi Minh City, Hai Phong and Yangon. A 12 month warranty covers material and workmanship defects, and spare fittings are kept in stock for repeat projects.
Frequently Asked QuestionsHow do I choose the right diameter and wall thickness?Send the flow rate, solids content and pump pressure. Our engineers calculate the minimum internal diameter that keeps the slurry velocity above the settling point, then select wall thickness from the working pressure with a safety factor of at least 2. A sized drawing is returned with the quotation.
Can you supply flanges that match our existing line?Yes. We machine steel flanges to DIN, ANSI, JIS, BS or SABS drilling patterns, and can copy a sample flange or send a matching drilling template before production starts.
What is the lead time for a repeat order?Standard diameters and wall thicknesses ship in 7 to 15 working days. Non standard colours, sandblast surface or custom flange drilling add 5 to 10 working days depending on quantity.
Talk to Our Pipeline EngineersSend your pipeline diameter, media type, flow rate and discharge distance through the inquiry form on this page. Our engineering team replies within one working day with a sized proposal, flange drawing and a quotation valid for 30 days. Samples and third party inspection are available on request before you place a bulk order.