logo
Products
PRODUCTS DETAILS
Home > Products >
Split Type Bolt Assembly HDPE Pipe Floater Quick Install For Dredge Hose

Split Type Bolt Assembly HDPE Pipe Floater Quick Install For Dredge Hose

MOQ: 20 Pieces
Price: USD 28-420 / Piece
Standard Packaging: Halves nested in pairs, bolts and gaskets packed in cartons, bundles strapped for container shipment
Delivery Period: 10-18 working days after deposit
Payment Method: T/T, L/C at sight, Western Union
Supply Capacity: 2500 Pieces per Month
Detail Information
Place of Origin
Shandong, China
Brand Name
Jiubei
Certification
ISO 9001:2015, SGS, CCS
Model Number
ID200-ID800
Technical Parameters:
Inner Diameter 200-800 Mm; Outer Diameter 450-1100 Mm; Length 600-1200 Mm; Wall 5-10 Mm
Bolts:
SS304 Hex Bolts, 8-12 Per Floater
Installation Time:
About 5 Minutes Per Floater With Two Workers
Net Buoyancy:
200-3000 Kg Per Floater
Highlight:

Split Type HDPE Pipe Floater

,

Bolt Assembly Pipe Floater

,

Quick Install Pipe Float

Product Description

The Split Type Bolt Assembly HDPE Pipe Floater solves a practical problem on working dredgers: how to add buoyancy to a pipeline that is already assembled and in the water. Each floater is moulded in two matching halves that close around the hose or pipe and are locked with stainless steel bolts, so no flange has to be opened and no section of the line has to be lifted out.

This design is widely used in Indonesian and Vietnamese dredging fleets that add or move discharge lines between projects, and in African mining operations where the pipeline stays in place for years and only the flotation is renewed. A closed-cell foam insert sits inside the two halves and can be replaced independently if it is ever damaged.

Key Features
  • Two-Half Construction: Both halves are interchangeable and fit around the pipe from either side, which simplifies handling on small workboats.
  • No Line Dismantling: Retrofit buoyancy to an existing pipeline without cutting, welding or opening a single flange.
  • Stainless Steel Fasteners: SS304 bolts resist saltwater corrosion; the recessed bolt seats protect threads from cable and rope abrasion.
  • Replaceable Foam Insert: The closed-cell foam core can be exchanged without replacing the HDPE shell, lowering long-term cost.
  • Fast Field Installation: Two workers fit one floater in about five minutes using a standard wrench.
  • Matched Buoyancy: Available from 200 kg to 3000 kg net buoyancy to suit 200-800 mm discharge hoses.
Technical Specifications
ParameterSpecification
Shell materialMDPE / HDPE, UV stabilised
ConstructionTwo bolted halves with locating step
Inner diameter200 mm to 800 mm
Outer diameter450 mm to 1100 mm
Floater length600 mm to 1200 mm
Wall thickness5 mm to 10 mm
FastenersSS304 hex bolts, 8-12 pieces
Net buoyancy200 kg to 3000 kg per piece
Installation timeAbout 5 minutes per floater
ColourOrange / yellow, custom on request
Applications in Indonesia, Vietnam and Africa

The split design is the preferred choice for dredging companies in Indonesia that move their cutter suction dredgers between sand pits several times a year, because the existing discharge hose can be re-floated without returning to a workshop. In Vietnam it is used on both river and coastal dredging lines where access for a crane is limited.

African mining and quarry operators use the bolted floater to maintain tailings and slurry lines in remote locations. Spare halves and foam inserts are light enough to be flown or trucked to site, and a damaged unit can be repaired during a normal shift.

Installation & Maintenance

Open the two halves, place them around the pipe at the marked position, insert the foam core and tighten the bolts in diagonal sequence. No adhesive or specialist tool is needed. The floater can be repositioned later by loosening the same bolts.

Because the fasteners are stainless steel and the shell is polyethylene, there is no rust jacking or painted surface to maintain. Check bolt tightness after the first week of service and once per season thereafter.

Packaging & Quality Assurance

Halves are nested in pairs to save container space. Bolts, washers and EPDM gaskets are packed in labelled cartons, and complete sets are strapped into bundles for shipment.

Each production batch is checked for dimensional fit, bolt hole alignment and net buoyancy. We provide an inspection report and material certificate, support third-party inspection, and warrant the shell and fasteners for 12 months against manufacturing defects.

Bilingual Selling Points | Ключевые преимущества (EN / RU)
EnglishРусский
Two bolted halves fit around an existing pipe without dismantling the lineДве половины на болтах устанавливаются на действующую трубу без демонтажа линии
SS304 hex bolts, 8-12 pieces per floaterБолты SS304, 8-12 шт. на поплавок
About 5 minutes installation with two workersМонтаж около 5 минут силами двух рабочих
Replaceable closed-cell foam insertСменный закрытоячеистый вкладыш из пены
Net buoyancy 200-3000 kg for 200-800 mm pipesПлавучесть 200-3000 кг для труб 200-800 мм
No flange opening and no welding on siteБез разборки фланцев и сварки на объекте
Frequently Asked Questions

Q: Can it be fitted without taking the pipe out of the water?
A: Yes. The two halves close around the pipe in place; the crew only needs access to the pipe surface, not to a flange.

Q: Are the bolts resistant to seawater?
A: SS304 is standard, and SS316 can be supplied for high-chloride or chemical service.

Q: Can I buy only replacement foam inserts?
A: Yes. Shells and foam inserts are supplied separately, so existing floaters can be refurbished.

Tell us your hose outer diameter and the length of line to be floated, and we will specify the number of split floaters and send a quotation the same working day.

Products
PRODUCTS DETAILS
Split Type Bolt Assembly HDPE Pipe Floater Quick Install For Dredge Hose
MOQ: 20 Pieces
Price: USD 28-420 / Piece
Standard Packaging: Halves nested in pairs, bolts and gaskets packed in cartons, bundles strapped for container shipment
Delivery Period: 10-18 working days after deposit
Payment Method: T/T, L/C at sight, Western Union
Supply Capacity: 2500 Pieces per Month
Detail Information
Place of Origin
Shandong, China
Brand Name
Jiubei
Certification
ISO 9001:2015, SGS, CCS
Model Number
ID200-ID800
Technical Parameters:
Inner Diameter 200-800 Mm; Outer Diameter 450-1100 Mm; Length 600-1200 Mm; Wall 5-10 Mm
Bolts:
SS304 Hex Bolts, 8-12 Per Floater
Installation Time:
About 5 Minutes Per Floater With Two Workers
Net Buoyancy:
200-3000 Kg Per Floater
Minimum Order Quantity:
20 Pieces
Price:
USD 28-420 / Piece
Packaging Details:
Halves nested in pairs, bolts and gaskets packed in cartons, bundles strapped for container shipment
Delivery Time:
10-18 working days after deposit
Payment Terms:
T/T, L/C at sight, Western Union
Supply Ability:
2500 Pieces per Month
Highlight

Split Type HDPE Pipe Floater

,

Bolt Assembly Pipe Floater

,

Quick Install Pipe Float

Product Description

The Split Type Bolt Assembly HDPE Pipe Floater solves a practical problem on working dredgers: how to add buoyancy to a pipeline that is already assembled and in the water. Each floater is moulded in two matching halves that close around the hose or pipe and are locked with stainless steel bolts, so no flange has to be opened and no section of the line has to be lifted out.

This design is widely used in Indonesian and Vietnamese dredging fleets that add or move discharge lines between projects, and in African mining operations where the pipeline stays in place for years and only the flotation is renewed. A closed-cell foam insert sits inside the two halves and can be replaced independently if it is ever damaged.

Key Features
  • Two-Half Construction: Both halves are interchangeable and fit around the pipe from either side, which simplifies handling on small workboats.
  • No Line Dismantling: Retrofit buoyancy to an existing pipeline without cutting, welding or opening a single flange.
  • Stainless Steel Fasteners: SS304 bolts resist saltwater corrosion; the recessed bolt seats protect threads from cable and rope abrasion.
  • Replaceable Foam Insert: The closed-cell foam core can be exchanged without replacing the HDPE shell, lowering long-term cost.
  • Fast Field Installation: Two workers fit one floater in about five minutes using a standard wrench.
  • Matched Buoyancy: Available from 200 kg to 3000 kg net buoyancy to suit 200-800 mm discharge hoses.
Technical Specifications
ParameterSpecification
Shell materialMDPE / HDPE, UV stabilised
ConstructionTwo bolted halves with locating step
Inner diameter200 mm to 800 mm
Outer diameter450 mm to 1100 mm
Floater length600 mm to 1200 mm
Wall thickness5 mm to 10 mm
FastenersSS304 hex bolts, 8-12 pieces
Net buoyancy200 kg to 3000 kg per piece
Installation timeAbout 5 minutes per floater
ColourOrange / yellow, custom on request
Applications in Indonesia, Vietnam and Africa

The split design is the preferred choice for dredging companies in Indonesia that move their cutter suction dredgers between sand pits several times a year, because the existing discharge hose can be re-floated without returning to a workshop. In Vietnam it is used on both river and coastal dredging lines where access for a crane is limited.

African mining and quarry operators use the bolted floater to maintain tailings and slurry lines in remote locations. Spare halves and foam inserts are light enough to be flown or trucked to site, and a damaged unit can be repaired during a normal shift.

Installation & Maintenance

Open the two halves, place them around the pipe at the marked position, insert the foam core and tighten the bolts in diagonal sequence. No adhesive or specialist tool is needed. The floater can be repositioned later by loosening the same bolts.

Because the fasteners are stainless steel and the shell is polyethylene, there is no rust jacking or painted surface to maintain. Check bolt tightness after the first week of service and once per season thereafter.

Packaging & Quality Assurance

Halves are nested in pairs to save container space. Bolts, washers and EPDM gaskets are packed in labelled cartons, and complete sets are strapped into bundles for shipment.

Each production batch is checked for dimensional fit, bolt hole alignment and net buoyancy. We provide an inspection report and material certificate, support third-party inspection, and warrant the shell and fasteners for 12 months against manufacturing defects.

Bilingual Selling Points | Ключевые преимущества (EN / RU)
EnglishРусский
Two bolted halves fit around an existing pipe without dismantling the lineДве половины на болтах устанавливаются на действующую трубу без демонтажа линии
SS304 hex bolts, 8-12 pieces per floaterБолты SS304, 8-12 шт. на поплавок
About 5 minutes installation with two workersМонтаж около 5 минут силами двух рабочих
Replaceable closed-cell foam insertСменный закрытоячеистый вкладыш из пены
Net buoyancy 200-3000 kg for 200-800 mm pipesПлавучесть 200-3000 кг для труб 200-800 мм
No flange opening and no welding on siteБез разборки фланцев и сварки на объекте
Frequently Asked Questions

Q: Can it be fitted without taking the pipe out of the water?
A: Yes. The two halves close around the pipe in place; the crew only needs access to the pipe surface, not to a flange.

Q: Are the bolts resistant to seawater?
A: SS304 is standard, and SS316 can be supplied for high-chloride or chemical service.

Q: Can I buy only replacement foam inserts?
A: Yes. Shells and foam inserts are supplied separately, so existing floaters can be refurbished.

Tell us your hose outer diameter and the length of line to be floated, and we will specify the number of split floaters and send a quotation the same working day.